|
![]() |
|||
|
GM NP205 CABLE SHIFTER KIT ______________________________________________________________________ Installation Guide: Part Checklist: (2) Bent Levers with Clevis Ends (2) Shift Knobs with Jam Nuts (1) Shifter Base (2) Cables (1) 205 Front Plate (1) 205 Back Plate (1) 205 Retainer Plate (1) 205 Rocker Arm Plate (1) 1/2" Threaded Rod (1) 3/8" Threaded Rod with Nut and DOM 205 Cable Shifter Kit Hardware List (1) 5/8" x 3/4" Strip Bolt (1) 5/16" x 3" Strip Bolt (1) 5/16" Stover nut (4) 5/16" Nylon Washer (4) 3/8" x 1" NC Cap Screw (2) 5/16"x 1" NC Cap Screw (1) 3/8 x 1 1/4" NC Cap Screw (2) 5/16 NC Stover Nuts (1) 3/8" NC Stover Nut (1) 5/16" H Valve End (1) Clevis Yoke (4) 3/8" Nylon Washers (3) 5/8" Nylon Washers (1) 1/2" SAE Washer (6) 1/2" NC Jam Nuts Step 1: Set your GM NP205 case on a clean flat table with the front output facing you. Start by removing (2) cap screws shown in photo below using a 9/16 socket. Position the Retainer mount over the NP205 Output as shown,and secure it in place with 3/8” x 1” NC Cap Screws ______________________________________________________________________________ Step 2: Position yourself infront of the rear output side of the 205 and remove the (2) 3/8" cap screws with a 9/16" socket like you did in the previos step. Position the Rear Mount bracket ( triangular shape with 3 holes ) on the back, so the 1/2" hole is above the case, and in line with the top hole of the Retainer mount installed in step 1. See photo in step 1. ______________________________________________________________________________ Step 3: Thread a ½” Jam Nut about 1” onto the ½” threaded rod.From the rear output side of the 205 – slide the rod through the top hole of the rear mount installed in step 2. Now thread on 2 more jam nuts and slide the rod through the retaining plate. Thread on one more jam nut and secure rod in place. ______________________________________________________________________________ Step 4: Slide a 5/8” Nylon washer over the 5/8”x3/4” Strip bolt. Slide this through the rocker arm ,another nylon washer and lastly a 1/2" washer. ...and thread into the front retainer plate installed in step 1. ______________________________________________________________________________ Step 5: On the other end of the rocker arm – slide a 5/16”x 1” NC Cap Screw through the shift rail, a 5/16” nylon washer, rocker arm and Stover nut. ______________________________________________________________________________ Step 6: We now focus our attention to the cables. Remove Jam nut and locking ring from one end of the cables. Now slide cable ends through bulkhead as shown. Reinstall locking ring and jam nut. Do not tighten down as these will have to be adjusted later. ______________________________________________________________________________ Step 7: Thread on both the Clevis Yoke and Valve end on the cable ends as shown. ______________________________________________________________________________ ______________________________________________________________________________ ![]()
| |
NorthWest FabWorks
1-250-248-6024
All content � 2004 - 2005 by NorthWest FabWorks